Severity Levels, used to define the overall magnitude of the event, figure into the creation of Response Scenario templates. Users with Edit Global Setting permissions can configure the number of Severity Levels to be used throughout Incident Manager.
Levels can be adjusted using the up and down arrows to the right of the level number.
Use the toggle switch to define the level as Most or Least Severe.
Comments
0 comments
Please sign in to leave a comment.