.png)
The Work Tasks tab enables users to assign the pre-planned tasks (created in a Work Assessment) to a Work Group. Authorized work tasks that were planned on the same Work Territory will be available for assignment in the “Available” window. Assign work tasks to this work group by selecting tasks from the “Available” window and hitting “Assign.” The respective tasks will move from the “Available” window to the “Assigned” window. After assigning, the status of the tasks will be updated from Authorized to ‘Assigned to Work Group’, and the assigned Tasks will be visible in a Work Group in the Crew Mode of Clearion X
Comments
0 comments
Please sign in to leave a comment.