After the crew Releases the construction job, the Work Request goes to Post-Construction Review for Modifications, then onto closing the job. These stages are identical in structure to Pre-Construction, requiring check-out, etc during each later stage to Complete.
The Construction Point Audit Report, ultimately for use by the Post-Construction team, is available for review at any stage of the work request life cycle can be filtered by OpCo, District, Work Request, etc.
This report is updated after each stage is completed with a full audit of changes made at each stage. All units for the job are displayed, with columns for design quantities and changes at every stage. Units added at any stage will display a zero (0) design quantity.
For more info on how to access, go here.